Cat III Long Leads

$20.00

SKU: MWK010 Category:

Description

These leads are CAT III 1000v with both ends banana plugs. They are about 60” (1.5 meters long).  They are high quality and a must for high voltage system. Sold in pairs, one black and one red.

Additional information

Weight 3 oz
Dimensions 6 × 2 × 1 in